ELECOX collaborating company IFMA Spain

Since March this year, Elecox has become a collaborating company of the IFMA Spain association. Although we were already members, this change means collaborating with them in a more active way as well as having a series of benefits in terms of marketing, communication and options in which we can grow together in the world…

ALCAMPO VAGUADA. INTEGRAL REMODELING AND CGBT

In the month of April we were awarded the comprehensive remodeling work of the Alcampo Vaguada hypermarket, including the CGBT, and after eight months of work we have considered it finished. This work has consisted of updating the entire electrical installation, modifying the spaces and sections of PF, and changing the lighting for state-of-the-art LED…

PREMIUM YELMO CINEMA. VIALIA SHOPPING CENTER

Cinema Yelmo arrives at Vialia Vigo with the surname “Premium”. With a duration of the work of 5 months, Elecox has carried out the electrical installation, lighting, public address system, voice and data. In addition to the adaptation of all the rooms, we have carried out the installations of the “Dulcería” and the installation of…

ALCAMPO VIALIA-VIGO

The new hypermarket Alcampo Vigo III is located within C. C. Vialia-Vigo. With a total duration of 6 months, Elecox has carried out the entire medium voltage installation, the installation of the CGBT and the general lighting. Regarding the environmental policy, in the construction of this Alcampo it has been carried out taking into account…

CIVIL WORK MAINTENERS. MI ALCAMPO

Our client MI ALCAMPO, Grupo Auchan’s super format, has awarded us the maintenance of civil works for all supermarkets nationwide. This maintenance will have an initial duration of 1 year and will consist of all repairs of paint, plumbing, locksmith, glassware, … Elecox makes available to the client highly qualified personnel distributed throughout the peninsula.…

C&A. NEW CLIENT

We have been awarded the contract to install the HV equipment and LV connections for the new store that C&A Modas is going to open in the Vialia-Vigo Shopping Center. This new store is located on the first floor of the Shopping Center and will have a total area of 1560 m2. The clothing firm…

MADRID TOWER. FACADE CONDITIONING.

The Community of Owners of Torre de Madrid has awarded us the refurbishment of the facade of the emblematic building in Madrid. The execution period of the works will be 4 months and the works will consist of the revision of 100% of the limestone façade (approximate measurement 18000m2), rebuilding all possible pieces and replacing…

AHORRAMAS. NEW CLIENT

Ahorramas becomes part of our client portfolio, after the award of the work for a new supermarkets in Guadalajara. Elecox will be responsible for carrying out all the electrical installation and lighting of this new center, which will have an area of 2870mts2 as well as a large parking lot for its clients. The AhorraMas…